TSL Post-Construction Cleaning Case Study: Managing a 500,000+ Sq. Ft. Industrial Project

by | Sep 3, 2026 | Blog | 0 comments

Table of contents

Executive Summary

Large-scale construction projects do not end when the building is erected.

Before a newly constructed facility can be passed from the developer and builder to its client, the property needs to be brought to a clean, presentable, and ready-to-use condition. On a project exceeding 500,000 square feet, that final stage can require significant manpower, specialized cleaning equipment, elevated-access capabilities, and careful coordination across multiple phases.

This was the challenge faced by TSL, a large developer and builder of major sites.

TSL brought in MCA Group to provide extensive post-construction cleaning support before the completed building could be handed over to its client.

The project required more than 20 MCA Group team members on site per day, with intensive support over a 60-day period, as part of a broader six-month, multi-phase project.

MCA Group’s responsibilities included:

  • Machine scrubbing of floors
  • Interior and exterior power washing
  • Window cleaning
  • High dusting
  • Specialty ceiling cleaning
  • Post-construction cleaning
  • Use of lifts and specialized access equipment

The project also required properly certified team members capable of safely operating the equipment needed to perform the work. MCA Group provided team members with the required certifications, including working-at-heights, scissor-lift, and boom-lift qualifications, allowing the team to use the client’s available lift and access equipment as required.

For MCA Group, this project demonstrated an important principle:

Large post-construction cleaning projects require more than manpower. They require experienced people, the right equipment capabilities, proper certifications, planning, and the ability to execute across multiple phases.

Project Overview

Project DetailProject Information
ClientTSL
Client TypeLarge Developer & Builder
Project TypeLarge-Scale Post-Construction Cleaning
Facility Size500,000+ sq. ft.
Project DurationSix months across multiple phases
Intensive On-Site Support20+ MCA Group team members per day
Intensive Cleaning Period60 days
Primary ServicesPost-Construction & Specialty Industrial Cleaning
Floor ServicesMachine Scrubbing
Exterior/Interior ServicesPower Washing
Elevated CleaningHigh Dusting
Ceiling ServicesSpecialty Ceiling Cleaning
Access RequirementsScissor Lift & Boom Lift
Team QualificationsWorking at Heights, Scissor Lift & Boom Lift Certifications

About the Project

TSL is a large developer and builder responsible for major construction projects.

Once a building has been erected, the development process moves into another critical stage: preparing the completed property for its client.

Construction can leave behind dust, debris, marks, residue, and other conditions that need to be addressed before a facility is ready for handover.

For a project covering more than 500,000 square feet, completing this work requires a substantial cleaning operation.

TSL needed a partner capable of supporting the project at scale.

That is where MCA Group came in.

The Challenge: Preparing a 500,000+ Sq. Ft. Facility for Handover

The objective was not simply to clean an individual room or perform a final janitorial visit.

MCA Group was supporting a massive post-construction cleaning operation across a facility exceeding 500,000 square feet.

The project required work across multiple areas and surfaces, including:

  • Large floor areas
  • Windows
  • Interior areas
  • Exterior areas
  • Elevated surfaces
  • Ceilings
  • Areas requiring high dusting
  • Newly constructed spaces requiring final cleaning

The scale of the building meant the work needed to be organized across multiple phases.

It also required a substantial workforce.

For the most intensive 60-day period, more than 20 MCA Group team members were on site each day.

The MCA Group Solution

MCA Group developed a large-scale post-construction cleaning operation to support TSL throughout the project.

Rather than approaching the facility as one single cleaning assignment, the work was performed across multiple phases over approximately six months.

The project included a concentrated period of 60 days with more than 20 team members working on site each day.

This allowed MCA Group to provide the manpower and specialty cleaning support required to move through the facility systematically.

The scope included both conventional post-construction cleaning and specialized services requiring trained personnel and appropriate equipment.

The Scale of the Operation

The numbers demonstrate the scale of this project.

500,000+ Sq. Ft.

The project involved a facility exceeding half a million square feet.

20+ Team Members Per Day

During the intensive 60-day period, more than 20 MCA Group team members supported the project each day.

60 Days

The intensive phase required daily on-site support over approximately 60 days.

Six Months

The broader project was completed across multiple phases over a six-month period.

This combination of facility size, manpower, duration, and specialty requirements made the TSL assignment a significant post-construction cleaning project for MCA Group.

Post-Construction Floor Cleaning

One of the major components of the project was cleaning the extensive floor areas throughout the facility.

MCA Group performed machine scrubbing to address the cleaning requirements associated with the newly constructed facility.

Machine scrubbing provides a more comprehensive approach to large floor areas than conventional manual cleaning.

For a facility exceeding 500,000 square feet, using appropriate machinery and experienced operators is essential to completing large floor areas efficiently.

Interior & Exterior Power Washing

The project also included power washing of interior and exterior areas.

Post-construction cleaning can require attention to surfaces throughout the property rather than being limited to interior rooms.

MCA Group supported TSL with power washing requirements across applicable interior and exterior areas as part of the broader cleaning program.

This helped address areas requiring more intensive cleaning as the facility progressed toward completion and client handover.

Window Cleaning

Windows were another component of the post-construction cleaning scope.

New construction projects can leave windows requiring detailed cleaning before a building is presented to its client.

MCA Group’s team supported TSL with window cleaning as part of the overall project scope.

This was an important element of preparing the completed facility for its next stage.

High Dusting

Large facilities create a significant challenge when it comes to elevated surfaces.

High dusting was therefore an important part of the TSL project.

MCA Group performed high dusting to address elevated areas that could not be effectively cleaned through standard floor-level cleaning methods.

This type of work requires appropriate access equipment and properly trained personnel.

The scale of the facility made planning and coordination especially important.

Specialty Ceiling Cleaning

In addition to high dusting, MCA Group performed specialty ceiling cleaning as part of the project.

Ceiling areas can require specialized attention following construction, particularly in a large facility where dust and construction-related residue may accumulate in elevated areas.

The work required the team to access and clean areas that were beyond the scope of conventional janitorial cleaning.

Certified Team Members

One of the most important elements of this project was having team members with the appropriate certifications to perform the required work.

The project involved access to specialized equipment, including scissor lifts and boom lifts.

MCA Group supported the project with team members who held the necessary qualifications, including:

  • Working-at-heights certification
  • Scissor-lift certification
  • Boom-lift certification

This meant the team was not only prepared to perform the cleaning work but also equipped with the qualifications required to work with the access equipment needed for the project.

Why Certification Matters on Large Cleaning Projects

Post-construction cleaning on a 500,000+ square-foot site is fundamentally different from routine office cleaning.

The work can involve:

  • Elevated surfaces
  • Large open areas
  • Specialized machinery
  • Access equipment
  • High dusting
  • Ceiling cleaning
  • Interior and exterior work

Having properly qualified personnel is therefore an important part of project readiness.

For TSL, the ability to rely on a cleaning partner whose team members were appropriately certified helped provide confidence that MCA Group could perform the required work while using the necessary equipment.

For MCA Group, certification is not simply a box to check.

It is part of ensuring that team members are properly equipped to perform the work and that clients can have confidence in the team on site.

Working With Client Equipment

Another advantage of having appropriately certified team members was MCA Group’s ability to utilize the lifts and equipment required for the project.

The team was equipped with the certifications necessary to operate equipment such as:

  • Scissor lifts
  • Boom lifts

This capability allowed MCA Group to support elevated cleaning requirements across the large facility.

It also reduced the limitation that can occur when a cleaning contractor does not have team members qualified to operate the equipment required for specialty work.

A Six-Month, Multi-Phase Project

The TSL project was not a single-day or single-phase cleaning assignment.

MCA Group supported the project across multiple phases over approximately six months.

The work included an intensive 60-day period with more than 20 team members working on site each day.

Long-duration construction cleaning projects require consistency.

The team needs to remain focused as the building progresses through different stages of completion.

Cleaning requirements can also change as different areas become ready for final work.

MCA Group’s role was to provide ongoing cleaning support as the project progressed.

How the Project Was Structured

While the exact workflow varied according to the construction schedule and project requirements, the work involved multiple stages of specialty cleaning.

Phase 1: Project Coordination

MCA Group aligned its team and cleaning requirements with the project schedule.

Phase 2: Site Preparation

Teams prepared to work across the required areas of the facility.

Phase 3: Large-Scale Cleaning

The team performed machine scrubbing, power washing, window cleaning, high dusting, and other cleaning requirements.

Phase 4: Elevated & Specialty Work

Certified team members performed high-level and ceiling-related cleaning using appropriate access equipment.

Phase 5: Ongoing Multi-Phase Support

MCA Group continued supporting TSL as different areas of the facility progressed through the project.

Phase 6: Final Cleaning Support

The cleaning operation helped prepare the facility for its eventual client handover.

The Importance of Post-Construction Cleaning

Post-construction cleaning plays an important role in the transition between construction completion and building handover.

A newly constructed facility may look complete from a construction standpoint, but the final presentation can still require substantial cleaning.

Dust, construction residue, marks, debris, and accumulated material can affect:

  • Floors
  • Windows
  • Ceilings
  • Elevated surfaces
  • Interior spaces
  • Exterior areas

A comprehensive final cleaning program helps bridge the gap between construction completion and client-ready presentation.

Results & Project Outcomes

The TSL project demonstrates MCA Group’s ability to provide substantial post-construction cleaning resources for large-scale developments.

Key project outcomes included:

Project MeasureResult
Facility size500,000+ sq. ft.
Total project periodApproximately 6 months
Intensive cleaning period60 days
Daily on-site team20+ team members
Project phasesMultiple
Floor cleaningMachine scrubbing
Power washingInterior & exterior
Elevated cleaningHigh dusting
Ceiling workSpecialty ceiling cleaning
Access equipmentScissor lifts & boom lifts
Team qualificationsWorking at Heights, Scissor Lift & Boom Lift

These figures provide a clear picture of the scale of the assignment without relying on unverified performance claims.

What Made the TSL Project Different?

Several elements made this project particularly significant.

TSL Post-Construction Cleaning Case Study

1. Exceptional Scale

At more than 500,000 square feet, the facility required a substantial cleaning operation.

2. Significant Manpower

More than 20 MCA Group team members supported the site each day during the intensive 60-day period.

3. Multiple Cleaning Disciplines

The project combined floor cleaning, power washing, window cleaning, high dusting, and specialty ceiling work.

4. Elevated Access Requirements

The project required access to elevated areas, making properly certified team members essential.

5. Long-Term Commitment

The broader project extended across multiple phases over six months.

6. Construction-to-Handover Support

MCA Group’s role was to help prepare the newly constructed facility for its client handover.

Beyond Large Projects: MCA Group Supports Projects of Every Size

The TSL project demonstrates MCA Group’s ability to handle large-scale post-construction and industrial cleaning projects.

But large projects are not the only projects that matter.

MCA Group also supports smaller:

  • Commercial warehouses
  • Industrial units
  • Post-construction projects
  • Specialty cleaning assignments
  • Commercial facilities

The philosophy is simple:

Big or small, every project is important.

A smaller warehouse may not require 20 team members.

A smaller industrial unit may not require months of cleaning.

But the client still deserves the same level of professionalism, care, communication, and attention to detail.

Why Choose MCA Group for Post-Construction Cleaning?

The TSL project highlights several capabilities that matter when choosing a post-construction cleaning partner.

Large-Scale Manpower

MCA Group can mobilize a significant cleaning team for major projects.

Specialty Cleaning Experience

The team can support floor scrubbing, power washing, high dusting, window cleaning, and specialty ceiling work.

Certified Personnel

Team members can hold qualifications required for working at heights and operating specialized access equipment.

Equipment Access Capability

Certified personnel can utilize required scissor lifts and boom lifts where applicable.

Multi-Phase Project Support

MCA Group can support projects extending over months and multiple phases.

Flexible Project Size

The company supports both major developments and smaller commercial or industrial projects.

Cost-Effective Service

MCA Group focuses on providing practical, cost-effective cleaning support based on the project’s actual requirements.

MCA Group’s Post-Construction Cleaning Capabilities

ServiceApplication
Post-construction cleaningNew construction and project handover
Machine scrubbingLarge floor areas
Power washingInterior and exterior areas
Window cleaningPost-construction presentation
High dustingElevated surfaces
Specialty ceiling cleaningLarge commercial and industrial spaces
Industrial cleaningManufacturing and industrial facilities
Warehouse cleaningCommercial and industrial warehouses
Specialty cleaningProject-specific requirements
Elevated-access cleaningAreas requiring lift equipment

A Partner You Can Rely On

Large construction projects require multiple contractors and service providers working toward the same final objective.

The cleaning partner needs to understand that the work is part of a larger project.

Schedules matter.

Coordination matters.

Equipment matters.

Certifications matter.

The quality of the final cleaning matters because the facility is ultimately being presented to the client’s customer.

MCA Group’s role in the TSL project was to provide the manpower, specialty cleaning capabilities, and certified personnel required to support that process.

Lessons From the TSL Project

The project demonstrates several important principles for large-scale post-construction cleaning.

Scale Requires Planning

A 500,000+ square-foot facility cannot be approached like a small commercial cleaning assignment.

Manpower Must Match the Project

The intensive phase required more than 20 team members per day.

Specialty Work Requires Specialty Capabilities

High dusting, ceiling cleaning, power washing, and machine scrubbing each require the right approach and equipment.

Certifications Matter

When projects involve elevated access equipment, properly qualified team members are essential.

Long Projects Require Consistency

Six months of multi-phase support requires a cleaning partner capable of maintaining service throughout the project lifecycle.

Frequently Asked Questions

What is post-construction cleaning?

Post-construction cleaning is the detailed cleaning performed after construction work is substantially complete to prepare a facility for occupancy, use, or client handover.

How large was the TSL project?

The TSL project involved a facility of more than 500,000 square feet.

How many MCA Group team members worked on the TSL project?

During the intensive 60-day period, more than 20 MCA Group team members worked on site each day.

How long did MCA Group support the TSL project?

The broader project was completed across multiple phases over approximately six months, including an intensive 60-day period.

What cleaning services did MCA Group provide for TSL?

The scope included machine scrubbing, window cleaning, interior and exterior power washing, high dusting, and specialty ceiling cleaning.

Did the project require elevated-access equipment?

Yes. The project required the use of equipment including scissor lifts and boom lifts for applicable elevated cleaning work.

Were MCA Group team members certified to use the required equipment?

MCA Group provided appropriately certified team members, including personnel with Working at Heights, scissor-lift, and boom-lift qualifications.

Does MCA Group only handle large post-construction projects?

No. MCA Group supports both large and small projects, including commercial warehouses, industrial units, and smaller post-construction cleaning assignments.

Does MCA Group provide post-construction cleaning across Canada?

MCA Group provides industrial and specialty cleaning services across Canada and can assess projects of different sizes and scopes.

Conclusion: From Construction Complete to Client Ready

The transition from a completed construction project to a client-ready facility requires careful attention to detail.

For TSL, that transition involved a facility exceeding 500,000 square feet, multiple phases of cleaning over approximately six months, and an intensive period requiring more than 20 MCA Group team members on site every day for 60 days.

MCA Group supported the project with:

  • Machine floor scrubbing
  • Window cleaning
  • Interior power washing
  • Exterior power washing
  • High dusting
  • Specialty ceiling cleaning
  • Certified elevated-access personnel
  • Scissor-lift capabilities
  • Boom-lift capabilities

The project required scale, specialized cleaning capabilities, trained personnel, and the ability to remain committed throughout a multi-phase construction schedule.

It is exactly the type of project where experience matters.

But MCA Group’s capabilities are not limited to projects of this size.

Whether you are managing a 500,000+ square-foot development, a commercial warehouse, an industrial unit, or a smaller post-construction project, MCA Group is ready to provide the cleaning support your project requires.

Big or small, every project is important to us.

Need Post-Construction Cleaning for Your Next Project?

If your development is approaching completion and requires professional post-construction, industrial, or specialty cleaning, MCA Group can help.

Our experienced and appropriately certified teams can support projects requiring machine scrubbing, power washing, high dusting, ceiling cleaning, window cleaning, and elevated-access work.

Request Your Free Estimate

Tell us about your project, facility size, timeline, and cleaning requirements, and MCA Group can help you develop a practical cleaning plan for the next stage of your project.

Related News & Articles

Call Us For Free Estimate